Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2024

September 30, 2024

January 30, 2026

To Be Determined

Site Work

No Information to Display

$9,780,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Frankfort, KY

56

15

2

3

Subscribe to View Full Documents

**Per Addendum 3 the bid date has been extended from 05/29/2024 to 06/05/24** Kentucky Department of Fish and Wildlife Resources is working with Ducks Unlimited to construct a new pump station at the northern end of Ballard Wildlife Management Area. The new pump station will provide a critical water source for the managed wetlands at Ballard WMA. The pump station will pull water from the Ohio River and deliver it to Shelby Lake at an estimated rate of 30,000-gpm. The design includes an intake on the Ohio River, piping to the cast-in-place concrete pump station, distribution piping to the outlet in Shelby Lake, installation of 3 submersible pumps, electrical/controls tower, road building, stream crossing culvert construction, and new power line installation. ALL QUESTIONS MUST BE SUBMITTED BY 12:00 P.M., E.T., JULY 22, 2024 There will not be a site visit meeting. The site is open to the public, interested contractors may visit the site at their discretion. ALL TECHNICAL QUESTIONS SHALL BE EMAILED TO THE ARCHITECT/ENGINEER OF RECORD FOR THIS PROJECT

46 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.