Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 9, 2024

June 10, 2024

September 30, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,850,000.00

Public - City

img_map_placeholder

Multiple Locations, Oceanside, CA

29

8

2

3

Subscribe to View Full Documents

Reference Number 0000349025 The scope of the project includes the construction of two traffic circles, traffic striping and signage, rectangular rapid flashing beacons (RRFB), a raised median, sidewalk, ADA-compliant pedestrian curb ramps, and high visibility crosswalks. Location of Work: The Work is located along Laurel Street, from the Laurel Elementary cul-de-sac to the Holly Street intersection, and along San Diego Street, from the Laurel Street intersection to the Bust Street intersection, in the Eastside community. Question Deadline 05/02/2024 at 2:00 PM PT Project Manager: Luis Cardenas City Of Oceanside Development Services Department 300 North Coast Highway Oceanside, Ca 92054 (760) 435-3573 All Questions Or Requests For Information Of A Technical Nature Should Be Directed To The Project Manager. Time for Completion. Time is of the essence in the performance of work under this contract. All work shall be completed in every detail to the satisfaction of the Engineer, exclusive of Maintenance Periods, within 80 working days after the commencement date set forth in the Notice to Proceed. Liquidated Damages: Per Section 7 of the General Provisions, Subsection 7.24, the Liquidated Damages for failure of the CONTRACTOR to complete the work within the Contract Time set forth in Subsection 1.3.4 and Section 6, Notice to Proceed are in the sum of seven hundred fifty dollars ($750) per consecutive day in excess of the contract time. Answer: The engineer's estimate is #1,650,000 - $1,850,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

67 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details