Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 25, 2024

May 6, 2024

September 27, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$5,025,239.00

Public - City

img_map_placeholder

Multiple Locations, Coon Rapids, MN

3

19

4

7

Subscribe to View Full Documents

**As of April 22, 2024, project was awarded to NORTHWEST ASPHALT COMPANY, in the amount of $5,025,239.11.** Reclaim Bituminous Surface, 46,987 SY; Remove Watermain, 11,600 LF, Remove and Replace Hydrants with Valves, 21 EA; Remove and Replace Valves, 21 EA; Remove Bituminous Surface 46,857 SY; Bituminous Non / Wear Course, 8,800 TON; New Storm Sewer Structures, 26 EA; Storm Sewer Pipe, 1,300 LF; 6"/8"/10" PVC Watermain 11,300 LF; 6" DIP Watermain 300 LF; 1" Corp/Curb Stop with Box 179 EA; Concrete Curb, 26,500 LF; 6" /8"Concrete Driveway Apron, 20,300 SF; Temporary Mailbox 179 EA; Street Signs, 179 EA; 1,000 Pavement Striping; and other necessary appurtenances. If the Contract is awarded by the City Council on April 2, 2024, it is anticipated that construction on this Contract could begin on May 6, 2024. A neighborhood meeting shall be held in Woodcrest Park (901 103rd Avenue NW) on Wednesday, April 24, 2024, from 5:00 to 6:30 p.m., and shall be attended by City staff, as well as the Contractor site foreman and superintendent. The purpose of this meeting is to inform residents of the intended construction schedule and introduce key Contractor and City representatives. The Contractor shall be given until September 13, 2024 (Final Completion) to complete all work on this project. Final completion is defined as complete installation of the asphalt wearing course pavement throughout all project areas. Permanent signing and striping installations and sawing and sealing operations are acceptable after the final completion date of September 13 but shall be complete no later than September 27, 2024. Please save this letter for your records. If you have any questions about permit coverage for this project, please contact the Construction Stormwater Program at 651-757-2119 or toll free at 800-657-3804.

54 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects