Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 28, 2024

May 13, 2024

November 1, 2024

US-422

Paving, Site Work

No Information to Display

$14,164,164.00

Public - State/Provincial

img_map_placeholder

US-422, West Franklin Township, PA

179

12

42

7

Subscribe to View Full Documents

This roadway resurfacing includes the milling of existing bituminous material, minor drainage, transverse and longitudinal joint repair and paving of bituminous leveling and wearing courses along US 422 from the Butler County line at segment 0010 offset 0000 east to 0.37 mile west of the East Franklin Township line at segment 0100 offset 0600 in West Franklin and East Franklin Townships and Worthington Borough, Armstrong County. Also included is ramp patching and repaving at the interchange associated with SR 268 and US 422 at segment 0002 offset 0000 to segment 0008 offset 0405, which includes preventative maintenance work on the bridge carrying SR 268 over US 422 in East Franklin Township, Armstrong County. Also included in this project is bridge work to include the bridge carrying US 422 over SR 4005 at segment 0100 offset 1895 to at segment 0110 offset 0573 Eastbound in Muddy Creek Township, Butler County and other miscellaneous construction, as indicated on the approved drawings included in the bid package. Project Cost Range: $12,500,000.00 - $14,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 6.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - US 422 County Line East PM *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects