Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 31, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Winnipeg, MB

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Reference Number 0000262283 The Services required under this Contract shall consist of Engineering Assessment and Estimate of Alexander Dock in accordance with the following: (a) Perform an inspection and condition assessment of the Alexander Dock. The inspection and assessment should identify portions and elements of the current dock structure that are structurally sound and could be feasibly re-used, refurbished or repurposed with the objective of establishing a docking facility suitable for public use including for mooring recreational watercraft and launching canoes, kayaks and paddle-boards. (b) Develop concepts and recommendations for the partial or full demolition of the dock structure and remediation of the disturbed areas. The current scope will not include the design of the final dock configuration, but will identify components of the existing dock that can be utilized within subsequent design exercises. (c) Develop class 3 cost estimates for: (i) Dock Demolition: (i) Option 1 - Demolition and removal of the entire dock structure. (ii) Additional Options as per D4(b) - Demolition of those portions of the existing dock structure that are deemed unsafe, unusable, and/or unnecessary for a re- configured structure. (ii) Riverbank erosion protection and stabilization work necessary to protect future structures and areas disturbed by demolition and landscaping. (iii) Environmental and heritage resource considerations. (d) Work should be completed the winter/spring 2024 season. The funds available for this Contract are $70,000.00 Comprehensive or Commercial General Liability Insurance including: (i) an inclusive limit of not less than $2,000,000 for each occurrence or accident with a minimum $2,000,000 Products and Completed Operations aggregate and $5,000,000 general aggregate Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.