Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 25, 2024

March 25, 2024

March 31, 2025

13885 MN-64

New Construction, Site Work

No Information to Display

$1,000,000.00

Public - State/Provincial

img_map_placeholder

13885 MN-64, Akeley, MN

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Site Address: 13885 MN-64, Akeley, MN 56433 Est. Value: $ 1,000,000.00 Est. Completion Date: March 31, 2025 The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Site preparation, excavation, grading, and utilities. 2. Concrete foundations, slab on grade concrete floor, reinforcement. 3. Pre-engineered metal building erection & framing. 4. Insulated metal panel installation, door & window installation, membrane roofing. 5. Mechanical & electrical work associated with building systems. This project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference and has a 4% (TG/ED/VO) subcontracting goal established. Alternate 1: Provide a 10'-0" wide concrete connection from the west overhead door to the existing sorting facility as indicated on the drawings. Alternate 2: Install exterior enclosure for seeding reception space. Including 3" insulated metal panels, additional framing around doors and windows, two overhead doors, two swing doors, windows, bollards, and mechanical & electrical systems as indicated on the drawings. Substantial Completion date is 290 days from notice to proceed. Final Completion date is 320 days from notice to proceed.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects