Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
January 25, 2024
February 26, 2024
No Information to Display
12880 NE 10th St
New Construction, Paving, Renovation, Site Work
No Information to Display
$5,000,000.00
Public - City
12880 NE 10th St, Choctaw, OK
Choctaw Nicoma Park Schools Multipurpose Facility Following Bid Packages: 1. Demolition 2. Earthwork 3. Soil Nail Wall / Aggregate Piers 4. Utilities 5. Pavement - Exterior Paving / Sidewalks 6. Segmental Retaining Walls 7. Concrete - Foundation / Walls / Slab 8. Masonry 9. Pre-engineered Metal Building Fabrication 10. Pre-engineered Metal Building Insulation 11. Structural Steel Fabrication 12. Structural Steel Erection (Including Pemb) 13. Metal Panel Facade 14. General Trades 15. Millwork / Counters / Windowsills 16. Waterproofing / Caulking / Joint Sealants 17. Roofing / Elevated Paver System 18. Doors / Frames / Hardware (Materials Only) 19. Overhead Doors / Coiling Counters Doors 20. Eifs 21. Glazing / Aluminum Storefront / Architectural Railings 22. Framing / Drywall / Ceilings 23. Tape / Bed / Painting 24. Flooring (Resilient / Soft / Athletic / Ceramic) 25. Sports Field 26. Division 10 Specialties (Materials Only) 27. Signage / Applied Vinyl Graphics 28. Lockers 29. Expansion Joint Systems 30. Window Shades 31. Sports Equipment / Wall Padding 32. Equipment (Laundry / Appliances) 33. Elevator 34. Fire Suppression Systems 35. Plumbing Systems 36. Hvac Systems 37. Electrical Systems / Lighting 38. Fire Alarm Systems 39. Av Systems Part 1 General Bidding Requirements a. It is the Intent of the Following to Describe the Scope of Work Included in Each Bid Package. The Bid Shall Include All the Requirements in the Specification Sections Listed Unless Specifically Excluded Below. If the Scope of Work Includes Labor, Then the Successful Bidders Must Provide General Liability, Auto and Workers Compensation With Certificate Listing Additional Insured and Waiver of Subrogation in Favor of the Owner, Architect, Construction Manager and Any Others Requested at Time of Contract Issuance. C. If the Scope of Work is to Only Supply Material, Then the Successful Bidders Must Include All Labor, Materials, Services and Incidentals Required for Complete Fabrication, Manufacture and Delivery to the Project Site the Materials Included in the Designated Specification Sections and Drawings. D. If Any Bidder is Unclear as to the Scope of Work Required, Contact the Architect/construction Manager Prior to Bidding. Prior Approval is Required for All Bid Packages. Do Not Modify, Add, or Delete From Scope of Work or You Risk the Owner Setting Your Bid Aside. E. The Construction Manager May Bid on Any or Any Combination of Bid Packages, but Will Declare Such Information at the Pre-bid Conference. . Owner Reserves Option to Award or Reject Any and All Bid Packages. G. If the Bid is in Excess of $50,000.00 Dollars, Payment and Performance Bonds Each in the Amount of 100% of the Contract Amount Covering Faithful Performance of the Contract, and Payment of All Obligations Arising There Under, Will Be Required by the Owner. A Warranty Bond in the Amount of 100% of the Contact Amount Covering Defective Workmanship and Materials for a Period of One Year After Acceptance of the Project Will Be Required. Premiums for the Performance, Payment and Warranty Bonds Are Included in This Proposal. It is Further Understood That, if Accepted by the Owner, This Bid Becomes a Part of the Contract Documents Upon Signing of the Contract, and Failure to Comply With Any Part of This Bid Will Be Taken as Failure to Comply With the Contract Documents, and Will Be Just Cause for Rejection of Any or All of the Work. H. Accompanying the Bid is Either (1) a Certified Check, (2) a Cashier's Check, or (3) a Bidder's Surety Bond Made Payable to the Owner for Not Less Than 5% of the Amount Submitted Herein. It is Understood That the Check or Bond Will Be Returned to the Bidder, Except That in the Event of the Owner's Acceptance of This Bid, and the Bidder Fails to Execute a Contract and File Performance and Materials and Payment Bonds Within Ten Days of the Date of the Owner's Acceptance; Then, in That Event, the Bidder's Check or Bond Will Become Property of the Owner Because of the Failure of the Bidder to Comply With the Specified Requirement. Bid Bond Must Be Accompanied by Bonding Agent's Power-of-attorney. I. Out-of-state Subcontractors to Provide Proof of Registration With the State of Oklahoma Upon Request Per State Law J. Bids Shall Include All of the Requirements of the Specification Sections Listed Unless Specifically Excluded Below. K. Each Bid Shall Include Removal of All Trash and Debris Created by Each Bidder's Work. Each Bid Shall Include Delivery / Loading/ and Unloading of Materials. L. This Work Will Be Completed at Existing Structures, Site Survey is Strongly Recommended. It is Likely Class and/or Students Will Be Present During Construction, Be Prepared for Possible Shifting of Activities Based Upon Operational Needs of the School. M. This Project is Tax Exempt. N. Bid Packages Are Designed to Be Bid Separately. Combination of Bid Packages Will Be Received, but Owner Reserves the Option to Award or Reject Regardless of Pricing Implications. O. Multiple Mobilizations Are Potentially Required, Based Upon Schedules of Work. P. Change Orders Will Only Allow a Maximum of Fifteen Percent (15%) for Overhead and Profit The Owner Reserves the Right to Reject Any or All Bids.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Choctaw, OK
Bid Date: May 12 2023
Vinita, OK
Bid Date: Jan 09 2024
Park Hill, OK
Bid Date: Jan 09 2024
Atoka, OK
Bid Date: Jan 30 2024
Midwest City, OK
Bid Date: Feb 13 2024
Broken Bow, OK
Bid Date: Jan 11 2024
Sand Springs, OK
Bid Date: Jan 09 2024
Glencoe, OK
Bid Date: Jan 11 2024
Skiatook, OK
Bid Date: Feb 02 2024
Enid, OK
Bid Date: Jan 02 2024
Tulsa, OK
Bid Date: Jan 16 2024
Oklahoma City, OK
Bid Date: Feb 08 2024
Tulsa, OK
--
Stillwater, OK
Bid Date: Jan 29 2024
Oklahoma City, OK
Bid Date: Jan 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
