Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 6, 2024

February 16, 2024

June 25, 2024

FL-15 & Mt Vernon St

Outdoor Lighting, Paving, Site Work

No Information to Display

$900,976.00

Public - State/Provincial

img_map_placeholder

FL-15 & Mt Vernon St, Orlando, FL

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Counties: Orange Road Name: SR-15 Limits: 75030000 Project(s): 44656815201(*) Federal Aid No: N/A Total Roadway Length: 0.021 Miles Contract Days: 130 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.021 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time:120 Lead Please Read the Full Advertisement Description: The Improvements under this Contract consist of, but not limited to, signalization, concrete pavement, curb & gutter, sidewalks, ADA ramps, signing & pavement markings, lighting, and ITS at the intersection of SR 15 and Mount Vernon Street in the City of Orlando, Orange County. Prequalification per Rule 14-22 is not required. Bidders must submit the BDI Reference Sheet (Form No. 275-000-02) with the bid unless bidder is prequalified in the project's major work type, per Rule 14-22, Florida Administrative Code. Upload the completed BDI Reference Sheet (Form No. 275-000-02) as a zip file using the '"File Attachment Upload" folder in the AASHTOWare Project Bids application. Question Deadline 12/28/2023 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 Traffic Signal Update - SR-15

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.