Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 1, 2024

March 1, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Multiple Locations, Roswell, GA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

This project involves a single location and encompasses tasks such as cleaning and re-establishing the invert to ensure proper filling of voids surrounding and beneath the pipe. It aims to line approximately 110 Linear Feet of 60' Corrugated Metal Pipe, combining measurements from two (2) pipe sections that carry a live stream underneath the roadway, utilizing either C.I.P.P. or Structural Concrete. Appropriate signs, flags, personnel, such as flaggers, barriers, and necessary safety gear must be provided as necessary. A Traffic Control Plan and Right of Way Permit will be required. Questions Due Date: Jan 18th 2024, 5:00 PM EST This project involves a single location and encompasses tasks such as cleansing and re-establishing the invert to ensure proper filling of voids surrounding and beneath the pipe. It aims to line approximately 110 Linear Feet of 6'' Corrugated Metal Pipe, combining measurements from two (2) pipe sections that carry a live stream underneath the roadway, utilizing either C.I.P.P. or Structural Concrete. Appropriate signs, flags, personnel, such as flaggers, barriers, and necessary safety gear must be provided as necessary. A Traffic Control Plan and Right of Way Permit will be required. Exactly 30 calendar days have been set aside for performance of the contract. Liquidated damages have been set at $500 per calendar day in accordance with the General and Supplemental Conditions. A Bid Bond in the amount of 5% is required. Payment and Performance bonds equal to 100% of the Awarded Contract value are required. The City reserves the right to reject any one or all bids.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.