Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 1, 2024

March 4, 2024

April 15, 2024

500 Alder St

Asbestos Abatement, Site Work

No Information to Display

$15,000.00

Public - City

img_map_placeholder

500 Alder St, Sultan, WA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

This work shall be completed within 6 weeks of the notice to proceed. Sultan reserves the right to reject any or all submittals, waive technicalities or irregularities, and accept any submittals if such action is believed to be in the best interest of the City of Sultan. All bids must be clearly marked: BID FOR Asbestos Abatement at 500 Alder Avenue City Owned Building Questions regarding this Invitation to Bid may be directed to the City Public Works Director at 360.793.2231 or via email at cityhall@ci.sultan.wa.us. 1. Remove and dispose of approximately 5,400 square feet of dry wall that contains asbestos throughout the house including the ceilings all the way to the studs. This work will also include: Includes labor, disposal, materials, permits, equipment, conduct air sampling before, during and after the asbestos removal, and insurance. Set up negative air pressure demand enclosure and seal off all air vents and breach to prevent crossed contamination. Work to be performed during days and times mutually convenient to the city and contractor. Work area will be cleared of any contents prior to start the asbestos abatement. All work to be performed in strict compliance with all federal, state and local regulations. Water and electricity will be provided by the city. Detailed specifications can be found on page nine (9) of the attached document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.