Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 2, 2024

February 12, 2024

October 2, 2024

FL-820

Outdoor Lighting, Paving, Site Work

No Information to Display

$6,367,813.00

Public - State/Provincial

img_map_placeholder

FL-820, Pembroke Pines, FL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Counties: Broward Road Name: SR-820/hollywood Blvd From SR-5/US-1 to N Ocean Drive Limits: 86040000 Project(s): 44765415201(*) Federal Aid No: N/A Project(s): 44765415202 Federal Aid No: N/A Total Roadway Length: 6.542 Miles Contract Days: 233 Total Bridge Length: 0.000 Miles Total Proposal Length: 6.542 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time:120 Please Read the Full Advertisement Description: The Improvements under this Contract consist of , but are not limited to, MOT (standard, traffic officer), erosion control (sediment barrier, inlet barrier), monitor existing structures (inspection, settlement, vibration), clearing (tree protection, tree trimming, tree removal), concrete (removal, curb and gutter, sidewalk, driveways), earthwork (sod strip regrading), asphalt (base, milling, resurfacing), drainage (concrete aprons, flumes), pavement markings (detectable, painted, thermoplastic, raised marker, bike lane), signing (single-post, removals), lighting (luminaire retrofit, pole complete, cable distribution, conduit, pull boxes), signalization (signal cable, aluminum pole, pedestrian signal, pedestrian detector), and sod along SR-820/Hollywood Blvd from US-1/SR-5 to N Ocean Drive, for 1.851 miles in the City of Hollywood, Broward County. Pre Qualified: Contractor must be pre-qualified. Performance bond: A Contract / Performance bond is required for this project Question Deadline 01/26/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 003 Miscellaneous Construction - SR-820

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects