Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
February 8, 2024
March 11, 2024
January 5, 2025
Multiple Locations
Renovation
No Information to Display
$250,000.00
Public - State/Provincial
Multiple Locations, Honolulu, HI
Hawaii Hall: Replacement of three (3) indoor air handling units, five (5) exhaust fans, chilled water piping system, ductwork, insulation, air terminal unit controls, and other related HVAC systems and equipment. Rebalance air handler systems and ventilation systems. Work also includes selective demolition, ceiling replacement, painting, plumbing, concrete, lighting, replacement of power and control wiring, hazardous material abatement and other miscellaneous related work. Crawford Hall: Replacement of four (4) outdoor air handling units, four (4) indoor fan coil units, chilled water piping system, ductwork, insulation, air terminal unit controls, and other related HVAC systems and equipment. Rebalance air handler systems and ventilation systems. Work also includes selective demolition, ceiling replacement, painting, plumbing, concrete, lighting, replacement of power and control wiring, hazardous material abatement and other miscellaneous related work. The contract time for this project shall be 300 consecutive calendar days from the effective date designated in the Notice to Proceed. From the effective date noted in the Notice to Proceed (NTP) letter, the Contractor shall proceed with his preparatory work such as preparing and forwarding submittals, obtaining approvals, obtaining permits, and other work as approved by the University. No work shall be allowed at the job site and no ordering of materials shall be allowed until receipt of the Notice to Proceed letter, or upon earlier written notice from the University. The Contractor shall be responsible for any air freight cost or overtime cost differentials necessary to complete the project within the project contract time. The Project Site is Hawaii Hall, 2580 Campus Road and Crawford Hall, 2550 Campus Road at the University of Hawaii Manoa Campus, Honolulu, Hawaii. If the Contractor is required or desires to use any design, device, material, or process covered by letters of patent or copyright, the right for such use shall be procured by the Contractor from the patentee or Owner. The Contractor and surety shall indemnify and hold harmless the State and its Departments and Agencies, any affected third party, or political subdivision from any and all claims for infringement by reason of the use of any such patented design, device, material, or process, or any trademark or copyright in connection with the work to be performed under the contract. The Contractor and surety shall indemnify the State and its Departments and Agencies for any costs, expenses and damages which it may be obliged to pay by reason of any such infringement at any time during the prosecution or after the completion of the work. The deadline to submit requests for clarification of the requirements of this IFB is January 17, 2024. All clarification requests shall be submitted via HePS QUESTIONS AND ANSWERS section, and all responses shall be issued in an addendum. The project shall in general consist of, but is not limited to, replacement of indoor and outdoor air handling units, indoor fan coil units, exhaust fans, chilled water piping system, ductwork, insulation, air terminal unit controls, and other related HVAC systems and equipment. Rebalance air handler systems and ventilation systems. Work also includes selective demolition, ceiling replacement, painting, plumbing, concrete, lighting, replacement of power and control wiring, hazardous material abatement, and miscellaneous related work, as shown on the Plans and Technical Specifications.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Honolulu, HI
--
Honolulu, HI
Bid Date: Sep 27 2024
Honolulu, HI
Bid Date: Oct 07 2024
Honolulu, HI
Bid Date: Oct 28 2024
Honolulu, HI
Bid Date: Oct 31 2024
Honolulu, HI
Bid Date: Sep 24 2024
Honolulu, HI
Bid Date: Sep 27 2024
Honolulu, HI
Bid Date: Jan 17 2024
Honolulu, HI
Bid Date: Jan 11 2024
Honolulu, HI
Bid Date: Jan 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
