Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
January 23, 2024
April 1, 2024
April 30, 2024
Multiple Locations
Paving, Site Work
No Information to Display
$60,000.00
Public - City
Multiple Locations, Des Peres, MO
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Two copies of the bid must be submitted in a sealed envelope with the project name, date, and time of opening clearly written on the envelope. The Scope of Work includes preparing and sealing of cracks and joints in city streets, providing traffic control and other incidental items as indicated on the construction drawings and specifications. It is anticipated this work will take place in April 2024, weather permitting. These same streets were cracksealed in 2022, or have since been resurfaced/reconstructed, so the amount of material needed should be lower than a first-time application. All bidders are expected to visit the project locations and become familiar with conditions. A detailed Street List and map are included. Bids and payment are to be based upon Centerline Feet, and actual quantities will not be measured in the field. A bid security in the amount of ten percent (10%) of the bid amount must accompany each bid in accordance with the Instructions to Bidders. The City reserves the right to accept or reject any bid and to waive any irregularities in the best interest of the City. Each bid shall be accompanied by a certified check or bank draft on a responsible solvent bank or a satisfactory bid bond executed by the bidder and Surety company and payable to the City of Des Peres, Missouri, in the amount of not less than ten percent (10%) of the Base bid plus the greatest of the Alternate bids. If the bidder fails to enter into a Contract with the City on the terms stated in his bid, or fails to furnish a Performance Bond as required by the Contract Documents, the amount of the Bid Bond shall be forfeited to the City as liquidated damages, not as a penalty. The Contractor, acting as an independent contractor, shall do everything required by the Contract Documents. The Contractor represents and warrants that he has special skills which qualify him to perform the Work in accordance with the Contract and that he is free to perform all such Work and is not a party to any other agreement, written or oral, the performance of which would prevent or interfere with the performance, in whole or in part, of the Work.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Des Peres, MO
Bid Date: Oct 31 2023
Nixa, MO
Bid Date: Jan 23 2024
Wildwood, MO
Bid Date: Jan 11 2024
Saint Charles, MO
Bid Date: Jan 04 2024
Kansas City, MO
Bid Date: Jan 23 2024
Tipton, MO
Bid Date: Jan 18 2024
Columbia, MO
Bid Date: Jan 30 2024
Saint Louis, MO
--
Saint Louis, MO
--
Springfield, MO
Bid Date: Feb 06 2024
Kirkwood, MO
Bid Date: Feb 06 2024
Florissant, MO
Bid Date: Jan 25 2024
Rogersville, MO
Bid Date: Jan 17 2024
Rolla, MO
Bid Date: Jan 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
