Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 22, 2024

April 1, 2024

September 28, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$5,110,395.00

Public - City

img_map_placeholder

Multiple Locations, Palo Alto, CA

36

55

2

Subscribe to View Full Documents

The engineer's estimate is $5,110,395.07 Work under this project includes, but is not limited to: asphalt concrete milling; placing asphalt concrete overlay; asphalt concrete pavement repair and replacement; remove and install storm drain pipes; install new manhole; mandatory use of recycled water; Portland cement concrete road base repair, removal and replacement of damaged sidewalk, curb, gutter and driveways; installing or replacing curb ramps, valley gutter, removal and replacement of concrete median curbs; installing truncated domes; tree trimming; traffic control; crack sealing; potholing; surveying; striping; signage; placing legends and pavement markers; site preparation; lowering manholes, catch basins, utility boxes, vaults and then raising back to grade following paving; repairs of six (6) bridges. Question Submission Deadline: January 10, 2024, 1:00pm Question Response Deadline: January 16, 2024, 5:00pm Work Commences (Tentative):April 1, 2024 Work Ends (Tentative):September 30, 2024 The City will verify the status of the contractor s license by checking the Contractor State License Board For all Bids greater than $25,000, Bidders shall submit a Bid security in the amount of not less than ten percent (10%) of the aggregate amount of the Bid including all Bid Alternates. Pursuant to Public Contract Code Section 7203, if Contractor fails to achieve Final Completion of the entire Work within the Contract Time, including any approved extensions thereto, City may assess liquidated damages on a daily basis for each day of Unexcused Delay in achieving Final Completion, based on the amount of One Thousand Six Hundred Fifty-One Dollars and Sixteen Cents ($1,651.16) per day, or as otherwise specified in the Special Provisions. City Council Approval Date (Tentative):March 4, 2024

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.