Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 18, 2024

February 19, 2024

No Information to Display

3500 Tdk Blvd

Renovation

No Information to Display

$400,000.00

Public - County

img_map_placeholder

3500 Tdk Blvd, Peachtree City, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Fayette County, Georgia is seeking quotes for repair of high service pump at Crosstown Water Treatment Plant. Question Deadline 01/10/2024 at 2:00 PM ET Address any questions you may have about this request for quotes to Natasha Duggan via email to nduggan@fayettecountyga.gov or fax to (770) 719-5534. Crosstown WTP Replacement 12-inch control valve for High Service Pump #1 travel to Crosstown Water Plant. Provide 12-inch Cla-Val model 131-01 globe control valve with 300# flanges- 12" 100-01 Hytrol Body CS2 Solenoid control (120V VAC) CK2 Isolation valves on pilot assemblies Check Valves on pilot tubing with Isolation Valve e. Atmospheric Drain X117D Position Transmitter X141 Pressure Gauges X43 "Y" strainer Epoxy coating Provide PC-22D Pump Control Panel a. FRP NEMA 4X control panel Remove old valve and piping. Reuse existing butterfly valve and air relief valve. Fabricate custom discharge spool (12" x 4" x 12" Tee) to accommodate new control valve. Blast and clean parts to be reused. Prime and coat piping components with Tnemec N69 Epoxy or equal (butterfly valve, air relief valve and discharge spool) per Coating Schedule specified. Installation of new Cla-Val, discharge spool, air relief retrofit, Cla-Val controller and related electrical equipment. 10. Integration of controller with motor control center (MCC). 11. Inspect and record critical dimensions. 12. Perform Cleanup. Crosstown WTP Replacement 12-inch control valve for High Service Pump #1 SCOPE AND SPECIFICATION RFQ 2354-A: Crosstown High Service Pump 1 Pump & Motor Repair Additional Work 13. Perform Start-up. 14. Verify operation (manual and remote SCADA).

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects