Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 26, 2024

February 26, 2024

No Information to Display

425 N Hillside Ave

Renovation

No Information to Display

$200,000.00

Public - City

img_map_placeholder

425 N Hillside Ave, Hillside, IL

Subscribe to View Full Documents

The bidder is specifically advised that the Village is a Sub recipient of the County of Cook of a grant pursuant to the Housing and Community Development Act of 1974, as amended. Compliance with the following requirements required: Stevens Amendment to the Department of Defense Appropriations Act of 1989, Prevailing Wage as determined by the Secretary of Labor (11/17/2023) in accordance with the Davis-Bacon Act, as amended, (U.S.C. Sections 76-276a-5), Contract Work Hours and Safety Standards Act (40 U.S.C. Sections327- 333), Copeland "Anti-Kickback Act" (18 U.S.C. Section 874) as supplemented in Department of Labor Regulations (29 CFR Part 3), Equal Employment Opportunity for the Community Development Block Grants. The Village of Hillside reserves the right to reject any and all proposals or bids. The Work of Project is defined by the Contract Documents and consists of the following: 1. Renovation of the existing Gymnasium on the Lower Level of the East Wimg and Renovation of other areas of the building require to support the Gymnasium Renovation. These areas include: o Lower Link (Toilet Rooms, Bathrooms, Data Room, Ejector Pump Room, Main Electrical Room, Corridor) o 3rd Floor East Wing (North Mechanical Room) o 3rd Floor Link (Boiler Room in NE corner) o NE Stair, SE Stair, Middle Stair - access/egress to the Gymnasium and to the 3rd Floor Work will include Architectural, Structural MEPFP (Mechanical, Electrical, Plumbing, Fire Protection and Technology Scope of Work.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.