Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 13, 2024

May 1, 2024

December 31, 2025

2050 4th Ave

Addition, Demolition, Renovation, Site Work

No Information to Display

$25,700,000.00

Public - State/Provincial

img_map_placeholder

2050 4th Ave, Stevens Point, WI

246

69

4

Subscribe to View Full Documents

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of: A new 2-story, 55,218 SF Student Health and Wellness Center addition to Champions Hall. Situated in the southwest corner of the facility, the new footprint demolishes Parking Lot F West and a small 1-story storage area, replacing both to the north with a new 1-story storage addition and new accessible parking. Exterior materials include brick, metal cladding, and curtain wall glazing. Inside, the addition provides new collaborative space for Fitness, Student Health, Counseling, and Testing Services programs. Separated from the existing building with a fire wall, this Type II-B steel structure features a concrete slab on grade, composite elevated deck, and steel roof deck. All new spaces will be protected with automatic sprinklers and will be fully accessible. Minor interior renovations to the existing facility for connecting circulation and infrastructure will be necessary. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted Please contact Chad Bloedel, (414) 290-3713, cbloedel@kahlerslater.com for additional information Bid date note : PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method)

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects