Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 11, 2024

February 12, 2024

March 31, 2024

Bayou Circle

Site Work

No Information to Display

$300,000.00

Public - State/Provincial

img_map_placeholder

Bayou Circle, Leesburg, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

The St. Johns River Water Management District (District) desires to procure a contractor to refurbish the 40-feet long by 4-feet wide Harris Bayou walkway. The statement of work includes providing all labor, equipment, site prep, and any necessary licensing and insurance to ensure a turn-key project. Refer to the attached Statement of Work for more project details. Minimum Qualification: Respondents must meet the minimum qualifications below and all supporting documentation must be submitted with the response to this quotation request. 1. Proof of firm's ability to do business in the state of Florida. (Respondent-provided documentation must be provided with quote response.) 2. Respondent must have completed at least two projects of a similar nature (refer to tasks outlined in the Statement of Work) in the past three years by the individual, firm, or project manager assigned to the project. (District-provided form, Qualifications - Similar Projects Form). 3. Respondent must have no less than five years of experience on projects of the nature specified in the attached Statement of Work. (District-provided form, Qualifications - Similar Projects Form) Once quotes are received, staff will review each quote and will make a recommendation for award based on the lowest bidder that meets all requirements of this quote request. If you need assistance or have any questions about submitting your quote, please email Breanna Pierce at BPierce@sjrwmd.com or call (386) 643-1168. The scope of work generally includes removal and disposal of all existing wood decking, rails and hardware fasteners and replace wood with new composite decking. The support system for all the walkway is assumed to be in good condition and does not need to be replaced. The District will inspect all aspects of the substructure prior to new deck boards being installed, should any rotten supports be identified, costs to replace will be negotiated at that time. The District is suppling all pressure treated wood and composite deck boards, all other materials shall be supplied by the contractor.

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.