Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 31, 2024

March 8, 2024

May 15, 2025

63rd St

Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

63rd St, Boulder, CO

86

15

3

Subscribe to View Full Documents

The work of this section consists of temporary measures for the control of erosion, sedimentation and other pollutants during construction. Work includes installation of such measures, maintenance during the contract period to assure proper function, and removal of temporary measures in coordination with installation of permanent erosion control measures. Reference Number 0000337591 Job Location: City of Boulder 63rd Street The project Work to be performed under this contract is located both within the limits of the City of Boulder (City) and outside of the limits of the City of Boulder, all within Boulder County, CO. The project Work is located along 63rd Street from approximately State Highway (SH) 119 at the north end to approximately Jay Road on the south end, generally in the east/northeast portion of the City of Boulder's (City) water service area. The site of the Work is at the general location as depicted on the Drawings (Project Vicinity Map). The Work consists of the construction of approximately 8,160 feet of 30-inch diameter treated water transmission pipeline. The 30-inch diameter pipeline will be constructed utilizing welded steel pipe and fittings. Pipeline construction will include the trenchless installation steel casing pipe at one crossing location of the Boulder & Left Hand Ditch box culvert, the Boulder White Rock Ditch box culvert, and a pedestrian underpass box culvert Question Acceptance Deadline 01/19/2024 05:00 PM MT Questions are submitted online No, Project Manager Daniel Kvasnicka City of Boulder Public Works Utilities Department Phone: 303-441-3201 Email: kvasnickad@bouldercolorado.gov Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % The proposal guaranty shall be a certified check, cashiers check, or bid bond in the amount of 5 percent of the Contractor's total bid. The lowest responsible and best bid shall be accepted; provided, however, that the city, acting through its duly authorized representatives, shall have the right to reject any and all proposals and waive any informality or irregularity contained in said proposal.

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.