Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 10, 2024

January 23, 2024

September 24, 2024

8485 Kipling St

Paving, Site Work

No Information to Display

$812,000.00

Public - City

img_map_placeholder

8485 Kipling St, Arvada, CO

Subscribe to View Full Documents

Reference Number: 0000337036 Job Location: 8485 Kipling St, Arvada, CO 80005 Question Acceptance Deadline 12/22/2023 02:00 PM MT Questions are submitted online Yes, Submit questions on website. Responses will be posted via addendum. For additional administrative information NOT related to the project, contact: Cheryl Dye at cdye@arvada.org Construction of Trailhead area - consists of: Estimated Approximate Quantities of Some Major Items of Work Are: Erosion Control & Stormwater Management 1 LS Construction Surveying and Staking 1 LS Site Demolition 1 LS Clearing and Grubbing 1 LS Tree Protection 48 LF Site Grading & Earthwork 1 LS Strip, Stockpile, & Place Topsoil 1 LS Modify Outlet Structure 1 LS Electrical Service & Lighting System 1 LS Concrete Paving (Standard Grey) 15,825 SF Concrete Paving (Colored) 230 SF Asphalt Paving 430 SF Curb Ramp 3 EA Sidewalk Chase 2 EA Concrete Edger 541 LF Curb & Gutter 62 LF Curb Cut 1 LS Trash Receptacle 6 EA Picnic Table 2 EA Seating Tablle 4 EA Bike Rack 5 EA Metal Bench 4 EA Interpretive Signage 3 EA Landscape Boulder 27 EA Bluegrass Sod 6,810 SF Native Seed 64,170 SF Shrub Bed Prep. & Wood Mulch 1,490 SF Shrub Bed Prep. & Cobblestone Mulch 7,715 SF Trees 48 EA Shrubs 170 EA Ornamental Grasses 55 EA Complete Irrigation System 1 LS Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % The City reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the City that such Bidder is properly qualified to carry out the obligation of the Contract and to complete the work contemplated therein.

103 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.