Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 8, 2024

April 22, 2024

December 6, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$3,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Downers Grove, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The scope of the work shall consist of structural concrete repairs, cleaning and painting structural steel, drainage system repairs, camera and electrical relocation, maintenance of traffic, signage and pavement marking improvement, site restoration and miscellaneous site work. The work to be done under this contract shall be started on or about April 22, 2024. All work under this contract shall be completed by December 2, 2024. The location of services to be performed is on the Reagan Memorial Tollway (1-88) at Mile Post 137.8 and Veterans Memorial Tollway (1-355) between Mile Post 15.5 and Mile Post 24.6 in DuPage County, Illinois. Complete the registration information to join WebEx. Please include the following: First Name Last Name Email address: (confirm email address) Phone number Title and Organization A completed Questionnaire and a statement of current contractual obligations on forms supplied by the Illinois Tollway will be required from the apparent low bidder once the apparent low bidder is determined. Each bid must be accompanied by a Bid Guaranty in the amount of five (5%) percent of the total amount shown in the bid for the contract. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft, certified check or cashier's check drawn on a solvent bank made payable to the Illinois State Toll Highway Authority. Question Deadline 2:00 p.m. local time on January 18, 2024 Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, 4801D.9292_Questions@docs.e-builder.net Estimated range: $1M - $3M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects