Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

February 8, 2024

May 24, 2024

1 University Dr

Paving, Renovation

No Information to Display

$678,700.00

Public - State/Provincial

img_map_placeholder

1 University Dr, Huron, OH

46

18

20

3

Subscribe to View Full Documents

Bowling Green State University (BGSU) is seeking General Contracting services for the Jerome Library Tunnel Renovation Phase 2 The planned scope of work includes tunnel top replacement and wall repairs at the existing Jerome Library Tunnel. Efforts also include asbestos abatement (potentially), utility insulation replacement, utility support retrofits, electric/lighting upgrades, insulation/jacketing, landscape restoration and pavement (asphalt and concrete) replacements. EDGE Participation Goal: 5% of contract Domestic steel use is required per ORC 153.011. Alternate Estimates: Alternate 1 Top Slab Replacement and Repair at Fine Arts Tunnel Alternate 2 Asphalt Drive $0 Alternate 3 Water Pipe Removal $5,500 Alternate 4 Storm Addition at Ridge Street $15,000 Alternate 5 Stainless steel in place of Galvanized Supports for Phase 2 Tunnel (Add to the total price extension of U3 for 15 full racks). $3,825 Alternate 6 - Stainless steel in place of Galvanized Supports for Phase 2 Tunnel (Add to the total price extension of U4 for 8 partial racks) $1,280 Alternate 7 - Phase 3 Tunnel Replacement Work $331,936 Alternate 8 - Stainless steel in place of Galvanized Supports for Phase 3 Tunnel (Add to the total price of Alternate 7 for 4 full racks) $1,050 Alternate 9 - Stainless steel in place of Galvanized Supports for Phase 3 Tunnel (Add to the total price of Alternate 7 for 4 partial racks) $2,120 Any additional questions/comments can be emailed to Travis Eifert at teifert@emht.com.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects