Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 19, 2024

February 19, 2024

August 5, 2024

Burton Way

Paving, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Burton Way, Beverly Hills, CA

17

9

26

3

Subscribe to View Full Documents

In general, the project consists of asphalt pavement (2-inch grind and overlay), curb ramp replacements, bus pad installation, replacement of existing pavement striping and markings with the current Caltrans standard striping, removal of existing striping and markings as applicable, placement of thermoplastic and traffic-rated paint, and installation of new bikeway striping. The proposed improvement is along Burton Way from Crescent Drive to Robertson Boulevard. Some project locations will require the work to be performed at night, on weekends, or with other working hour restrictions. Online Q&A Yes Q&A Deadline 01/08/2024 4:00 PM (PST) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 120 working day

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.