Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 10, 2024

February 9, 2024

March 5, 2025

2006 E Newberry St

Renovation

No Information to Display

$300,000.00

Public - City

img_map_placeholder

2006 E Newberry St, Appleton, WI

31

23

26

6

Subscribe to View Full Documents

Sludge Piping & Digester Heat Replacement Exchangers Project Site Address: 2006 Newberry Street Pre-Qualification: Yes Project - the Work Covered by These Contract Documents Consists of Demolishing Blended Sludge Piping and Valves and Providing New Blended Sludge Piping and Valves, Demolishing and Providing a New Pre-heat Tube-in- Tube Blended Sludge Heat Exchanger, Demolishing Digester Sludge Piping and Valves And Providing New Sludge Piping and Valves, Rehabilitating Two (2) Primary Digester Tube-in-tube Heat Exchangers, and Demolishing Aluminum Cladding On the Blended Sludge Tank and Providing a New Tpo Roof and Pre-finished Metal Wall Panels, Installing a New Ladder and Railing on the Blended Sludge Tank and Other Items Described in the Bidding Documents for the Wastewater Treatment Plant Sludge Piping & Digester Heat Exchangers Replacement Project Complete and Operational for the City of Appleton, Department of Utilities, Calumet, Outagamie & Winnebago Counties, Wisconsin. Bid Security No Bid Shall Be Received Unless Accompanied by a Certified Check or Satisfactory Bid Bond Payable to the City of Appleton in an Amount Not Less Than 5% Of the Maximum Bid as a Guarantee That, if the Bid is Accepted, the Bidder Will Execute and File the Contract, Performance/payment Bonds and Insurance Certification, as Required by the Contract Documents, Within 15-days After the Notice of Award. Bid Rejection - the Owner Reserves the Right to Reject Any and All Bids, Waive Any Informalities in Bidding or to Accept the Bid or Bids Which Best Serves the Interests of the City of Appleton. Withdrawal of Bids No Bid Shall Be Withdrawn for a Period of 90-days After the Scheduled Opening Without the Consent of the Owner. The City of Appleton's Decision as to Qualifications Shall Be Final. Governing Laws & Regulations - the Contract Letting Shall Be Subject to the Provisions of Sections 66.0901, 66.0903 and 779.14 of the Wisconsin Statutes. All questions about the meaning or intent of the Contract Documents shall be submitted to the ENGINEER / ARCHITECT in writing Question Deadline 01/05/2024

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.