Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

March 11, 2024

No Information to Display

201 W Sheridan St

Demolition, New Construction, Site Work

No Information to Display

$40,000,000.00

Public - City

img_map_placeholder

201 W Sheridan St, San Antonio, TX

98

7

2

9

Subscribe to View Full Documents

Demolition, site work and new construction of a mixed-use development in San Antonio, Texas. Completed plans call for the construction of a 58,648-square-foot, two-story above grade fitness / recreation center; for site work for a fitness / recreation center; and for the demolition of a fitness / recreation center. The San Antonio River Authority is seeking a Construction Manger at Risk (CMAR) firm to construct a new Administration Building at the Sheridan Street Campus. The new building will consist of a new twostory 55,000 SF office building blending a 3,000 SF biosafety level 2 (BSL-2) water testing laboratory and a 2,150 SF Fitness Center with the amenity spaces intended for the River Authority staff. Creative and collaborative spaces accent the proposed new office space with modern team building and conference rooms. Complimenting this creative space will be a 1,500 SF Cafe, and 2,000 SF Conference Center. It is envisioned as hybrid mass timber (steel beams and columns with mass timber deck) with a sizable portion exposed to view in interior spaces. True north building faces and daylight modeling allows the project LEED Certifications or Qualifications. All MEP systems are highly energy efficient using conservation and sustainability as their design parameters, with energy modeling for geothermal systems ongoing. 00262-Pre-Solicitation Meeting for Construction of Sheridan Administration Building Dec 12, 2023, 10:00 to 11:00 AM (America/Chicago) The currently developed 3.57-acre site will be transformed to become a model of stormwater management in the City of San Antonio. Site design will be net zero for all irrigation needs and include minimal impact development strategies, cisterns for water catchment, and native planting. The existing parking area is proposed to be revitalized to maximize water permeation while covered by Photovoltaic arrays through a community solar program. The River Authority is working with consultants to effectively and harmoniously secure the property that does not deter from the buildings design. The River Authority is seeking a CMAR to contribute to the design phase, construction document phase, demolition of the current structure and completion of a new administration building. The cost for the project is estimated at $30-40 million. Question Deadline 12/15/2023 at 11:00 AM CT Any questions in reference to this response should be directed to the Purchasing Department. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.