Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 11, 2024

March 11, 2024

October 15, 2024

OH-29

Demolition, New Construction, Paving, Site Work

No Information to Display

$1,470,018.00

Public - State/Provincial

img_map_placeholder

OH-29, Celina, OH

35

5

5

Subscribe to View Full Documents

County: Mercer Dbe Goal: 10.00 Bridge Replacement (1 Bridge) C/r/s: Mer-sr 29-07.80 Completion Date: 10/15/2024 For Improving Various Sections in Jefferson Township, in Mercer County, of the State of Ohio, in Accordance With Plans and Specifications by Removing an Existing Single-span Steel Beam Bridge on Wall Type Abutments Carrying Sr-29 Over Big Beaver Creek and Replacing With a Three-span Concrete Slab Structure on Capped Pile Piers and Abutments. Work Also Includes Minor Paving at Approaches, Guardrail Upgrades, and Drainage Improvements. OH DOT - SR 29 - Bridge Replacement (1 Bridge)

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.