Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 11, 2024

February 12, 2024

October 1, 2024

OH-328

Site Work

No Information to Display

$274,038.00

Public - State/Provincial

img_map_placeholder

OH-328, New Plymouth, OH

28

5

5

Subscribe to View Full Documents

County: Hocking C/r/s: Hoc-sr 328-06.22 For Improving a Section of Sr 328 in the Township of Starr, of the County of Hocking, of the Great State of Ohio, in Accordance With Plans and Specifications of the Department of Transportation by Replacing a Culvert at Hoc-328-6.23 With a 34" X 53" Concrete Eliptical Pipe and All Related Work. OH DOT - Two Lane Resurfacing - SR 196/SR 197/SR 198-Var MBE (7%), WBE (7%), DBE (7%)

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects