Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 30, 2024

February 1, 2024

January 22, 2027

901 McKay Rd

Renovation

No Information to Display

$16,000,000.00

Public - County

img_map_placeholder

901 McKay Rd, Pickering, ON

202

71

125

8

Subscribe to View Full Documents

Duffin Creek Water Pollution Control Plant (WPCP) rehabilitation of stage 3 liquids and miscellaneous remedial works. Bidders who prequalified under Region of Durham Request for Prequalification RFPQ-1002-2023 Prequalification of General Contractors for the Duffin Creek stage 3 liquids and miscellaneous remedial works project shall be considered for contract award. Project Description: - The Receipt, Storage, Handling, installation, Testing, Commissioning and placing into service of pre-purchased equipment from pre-Purchases Equipment Vendors by the Durham Region. - The description of the Work is not, nor is it intended to be, complete and all-inclusive. The Contract Documents shall be read by the Contractor as a whole in determining the scope of Work. - The Contract includes miscellaneous upgrades across the plant site to maintain infrastructure in a state of good repair. - The Work listed below shall include the provision and installation of all equipment. Installation of all equipment supplied under this Contract shall include testing and commissioning. - In general, the Work in each building/treatment process area consists of but is not limited to the work described in the attachment to this section (01 11 00-01 Scope of Work Map). - Each Section of the Specifications is not necessarily complete. - The Contractor shall read each Section in conjunction with all the other Contract Documents. The Contractor shall also ensure that Subcontractors read the relevant documents and comply with the requirements of the Contract. - The Contractor shall generally perform the Work according to the suggested sequence of construction and within the construction constraints provided in Section 01 52 10. Documents can be obtained at: https://durham.bidsandtenders.ca Question Deadline: Tue Jan 16, 2024 5:00:00 PM (EST)

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects