Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 5, 2024

February 5, 2024

May 5, 2025

315 Spencer Plains Rd

Renovation

No Information to Display

$249,141.00

Public - State/Provincial

img_map_placeholder

315 Spencer Plains Rd, Westbrook, CT

Subscribe to View Full Documents

Troop F Generator Replacement 315 Spencer Plains Road Westbrook, CT Contract Time Allowed: Calendar Days: 455 Prevailing Wages: This is a Prevailing Wages Project Liquidated Damages: $ 258.00 Per Calendar Day Beyond Substantial Completion. $ 258.00 Per Calendar Day Beyond 90 days After Substantial Completion. Cost Estimate Range: $ 225,414.00 To $ 249,141.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor who is selected to perform this State project must comply with C.G.S. 4a-60, 4a-60a, 4a-60g, and 46a-68b through 46a-68f, inclusive, as amended by June 2015 Special Session Public Act 15-5. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract be set aside for award to subcontractors holding current certification from DAS under the provisions of C.G.S. 4a-60g. (25% of the total state-funded value with DAS-certified Small Businesses and 6.25% of the total state-funded value with DAS-certified Minority-, Women-, and/or Disabled-owned Businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals. All questions must be emailed (not verbal or by phone) to the consulting Architect/Engineer (Larry Jones, BVH Integrated Services, Email: larry.jones@salasobrien.com) with copies sent to the DAS/CS Project Manager (Michele Helou, Email: michele.helou@ct.gov). Must be submitted 14 Calendar Days prior to the Bid Due Date.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.