Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 17, 2024

May 6, 2024

November 1, 2024

Multiple Locations

Site Work

No Information to Display

$2,500,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Saint Ignatius, MT

Subscribe to View Full Documents

Site Directions: The Falls Creek Diversion Rehabilitation Project - is located at the intersection of Falls Creek and the Tabor Feeder Canal in the Mission Mountains approximately 13 miles southeast of St. Ignatius, MT on the Flathead Indian Reservation, MT. A project pre-bid meeting is scheduled for Wednesday December 13, 2023, from 10 AM to noon (local time) at the Salish Kootenai Kicking Horse Complex, 33019 Quequesah Drive, Ronan, MT 59864. The pre-bid meeting is NOT mandatory, but all prospective bidders are encouraged to visit the project site at Falls Creek Diversion approximately 13 miles southeast of St. Ignatius, Montana. Travel to the site in the winter months may require a tracked UTV or similar equipment and may not be accessible via a 4x4 vehicle. Photographs and aerial UAV footage will be shared during the pre-bid meeting. Failure by bidders to inspect the site or the review the photographs and UAV footage will not relieve bidders from the responsibility of properly estimating the difficulty or cost of successfully performing the work in accordance with the contract documents. Project Category Code: Irrigation, Street/Road Repairs, Culverts, Waterways, Stormwater Channels, Demolition/Building Removal/Hauling/Salvage, Water Diversion Structure, Concrete/Formed/Flatwork/Foundation Description: The Confederated Salish and Kootenai Tribes desire to enter into a Construction Agreement with a general construction contractor to demolish, remove, and replace the existing Falls Creek reinforced concrete structure, install new control gates, and a concrete measurement flume downstream on the Tabor Feeder Canal; remove the existing bridge over Falls Creek and replace with a concrete box culvert; and make improvements to the access road to the project site to facilitate the mobilization of construction equipment and materials. Estimated cost range of project: From $2,000,000 to $2,500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.