Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 15, 2023

January 15, 2024

March 15, 2024

319 Truitt St

Renovation

No Information to Display

$148,880.00

Public - City

img_map_placeholder

319 Truitt St, Salisbury, MD

Subscribe to View Full Documents

Truitt Street Community Center HVAC Installation 1. Furnish and install (2) Carrier 10-ton package AC units with gas heat 2. Duct Work: I. Exterior supply and return air sheet metal duct work from new units will be insulated and weather sealed. Ducts will be run exposed on exterior of building. II. New un-insulated sheet metal spiral supply air ducts will be installed above drop ceilings, and hung below drywall ceilings. III. Space above drop ceilings will be used as plenum for return air back to new equipment. IV. Grills and diffusers furnished and installed 3. Zone Control I. Nine (9) Thermostatically controlled zone dampers will be provided for individual space temperature control and will be integrated with new sheet metal duct system. One new thermostat will be provided for each zone. Control work includes all necessary low voltage control wiring routed to new zone control panel located in front closet 4. Exhaust I. (3) New inline exhaust fans will be provided and ducted through south wall. Sheet metal exhaust air will be installed above drop ceilings in bathrooms and kitchen. 5. Gas Piping I. Coordinate with Chesapeake Utilities for routing and sizing of gas piping needed to serve new HVAC units. Provide necessary gas piping from new gas meter to equipment. 6. Additional requirements: I. All new equipment will be started and tested per factory specifications II. Owner training provided for proper use of new equipment Question Deadline 12/06/2023 at 12:00 PM ET

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.