Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
December 12, 2023
April 12, 2024
July 31, 2026
720 Heber Ave
LEED Certification, Site Work
No Information to Display
$13,000,000.00
Public - State/Provincial
720 Heber Ave, Calexico, CA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
The State of California, acting through the Board of Trustees of The California State University, hereinafter called Trustees, on behalf of San Diego State University, hereinafter called University, is requesting Statements of Qualifications (SOQ) from interested and qualified Design-Builders (Respondents) to provide design, preconstruction and design-build construction services for the project referenced above (Project). In general, the scope of work consists of the design and construction, under a procedure more commonly referred to as "turnkey construction", of a Fixed Price Design Build Project, for the Calexico Student Resident Housing building. We are seeking to build a housing project with a minimum of 40 resident bedrooms, all of which need to have immediate access to a bathroom and kitchenette, and one two-bedroom apartment with full kitchen and bathroom for the resident property manager. Bedrooms will need to have the ability to be double occupancy. If the project proposes a "suites" style, a maximum of two bedrooms per suite is suggested. 2,000 square feet of common area space is requested. Any area above this common area square footage is not desirable, the University would prefer as many bedrooms as possible (min. 40) to accommodate up to 80 residents for the fixed price. Kitchenette should provide no less than a mini-fridge, convection/microwave, and sink. An induction cooktop is preferred but not required. Complex must be gated with vinyl-coated 6' fence consistent with existing campus gate/fence structure, with electronic access control provided at all doors. Online Q&A : Yes Q&A Deadline : 12/01/2023 5:00 PM (PST) Start/Delivery Date : Estimated February 2024 Project Duration : Approximately 884 days for project completion.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Calexico, CA
Bid Date: Mar 04 2024
Calexico, CA
Bid Date: Jan 11 2024
Calexico, CA
Bid Date: Oct 05 2023
Calexico, CA
Bid Date: Sep 01 2023
Calexico, CA
Bid Date: Aug 25 2023
San Diego, CA
Bid Date: Feb 21 2024
San Jose, CA
Bid Date: Nov 28 2023
Perris, CA
Bid Date: Jan 16 2024
Dutch Flat, CA
Bid Date: Jan 19 2024
San Francisco, CA
Bid Date: Jan 11 2024
Paso Robles, CA
Bid Date: May 26 2023
Fresno, CA
Bid Date: Jan 25 2024
Los Alamitos, CA
Bid Date: Jan 22 2024
Salinas, CA
Bid Date: Jan 23 2024
Garden Grove, CA
Bid Date: Feb 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
