Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 27, 2024

November 26, 2024

April 25, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$2,447,578.00

Public - City

img_map_placeholder

Multiple Locations, Twin Falls, ID

114

27

10

3

Subscribe to View Full Documents

As od September 24, 2024 this project was awarded to RS Jobber in the amount of $2,447,578.30 In determining the lowest responsive bid, the Owner will consider all acceptable bids on a basis consistent with the bid package. The Owner will also consider whether the bidder is a responsible bidder. All bids must be signed. Bids must be accompanied by Bid Security in the form of a bid bond, certified check, cashiers check or cash in the amount of 5% of the amount of the bid proposal. Said bid security shall be forfeited to the City of Twin Falls as liquidated damages should the successful bidder fail to enter into contract in accordance with their proposal as specified in the instructions to Bidders. The Shoshone Falls Grade project consists of four construction schedules in total. A.) The Shoshone Falls Grade Rock Removal schedule includes blasting operations to remove a rock face overhanging the roadway of Shoshone Falls Grade. A rock catchment area will also be constructed. B.) The Shoshone Falls Grade Roadway Reconstruction schedule includes widening and reconstructing Shoshone Falls Grade, and the intersection with Dierkes Road, constructing curb and gutter, constructing spring and storm water catchment and pipe systems. Guardrail will also be placed in select areas. C.) The Dierkes Road Roadway Reconstruction schedule includes widening and reconstructing Dierkes Road, constructing curb and gutter, constructing spring and storm water catchment and pipe systems, and constructing an asphalt path. D.) The Shoshone Falls Grade Pedestrian Pathway schedule includes construction of a pedestrian pathway and pedestrian bridge from the proposed path on Dierkes Road to the proposed Shoshone Falls Grade roadway. Questions can be directed to: J-U-B ENGINEERS, Inc. Contact: Chelsea James, P.E. Phone: 208-733-2414 Email: cjames@jub.com

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects