Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 11, 2024

September 30, 2024

September 1, 2025

469 Liberty St

Outdoor Lighting, Paving, Site Work

No Information to Display

$1,400,000.00

Public - City

img_map_placeholder

469 Liberty St, Springfield, MA

1

16

6

3

Subscribe to View Full Documents

Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Includes: temporary sediment and erosion controls, earthwork, drainage, paved walkways, construction of concrete bike and skate park, installation of owner-furnished elements including splash pad equipment, swing set, site furnishings, electrical work, new water service, and landscaping. Project Field Superintendent/Supervisor. 1. The Project Field Superintendent/Supervisor shall be the employee of the Contractor or Skatepark Subcontractor who directs and coordinates the Contractor's or subcontractors' daily physical construction activities in the field. 2. Responsibilities ofthe Project Field Superintendent/Supervisor include, but are not limited to: a. Physically overseeing, coordinating and scheduling day to day construction work. b. Coordinating with subcontractors and the Engineer as needed for the execution of the work. c. Responsible for the day to day execution of the work. Question Deadline 08/30/2024 at 4:30 PM ET Questions regarding the IFB should be in writing and delivered via email or fax (413) 787-6295 to: Office ofProcurement Attn: Neil Walker, Deputy Procurement Officer City Hall-Room 307 36 Court Street Springfield, MA 01103 nwalker@springfieldcityhall.com The Department ofParks, Buildings, and Recreation Management- Parks Division is issuing this IFB for Development of Springfield Bike & Skate Park at Gurdon Bill Park. In general, the Contractor shall supply all labor, equipment, materials, temporary storage, facilities, tools, and other appliances necessary for the work in this section and as required to properly complete the project in accordance with these contract documents and good construction practice

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects