Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 21, 2023
December 21, 2023
May 1, 2024
Multiple Locations
Paving, Site Work
No Information to Display
$35,000.00
Public - City
Multiple Locations, Morrisville, NC
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The Town of Morrisville, NC (hereinafter referred to as the "Town") is soliciting proposals from qualified vendors for the purpose as described below: Sidewalk Cutting Contract FY24- this project includes evaluation of repair areas, horizontal cutting of sidewalk panels using dust collection procedures, and data collection. The Contractor shall provide all materials, equipment, labor and supervision for concrete cutting, trip hazard removal, maintenance, repair, and all other associated services. Work shall be performed at various locations in the Town of Morrisville. The Town will release work by providing Contractor with a list of locations that need to be addressed, at which time the Contractor is to deploy, measure and address the items identified. These areas will be confirmed and overseen by a Town representative as part of the performance of work. The services shall include, but are not limited to: Upon request from the Town, evaluate the areas designated to classify the number and location of trip hazards according to the Town's specification; typically, these hazard classes are: o LEAST SEVERE =.25 to .5inches o SEVERE =.5 to 1inch o MOST SEVERE =1 to 2.5inches Eliminate Trip Hazards (Vertical Height Displacements) o Repair all sidewalk trip hazards from 1/4" to 2.5" in height in the designated work areas. Hazards will be completely removed using horizontal cutting from one end of the raised sidewalk joint to the other where applicable (edge-to-edge), including flush to an abutting obstacle such as a retaining wall leaving a zero point of differential between and without causing damage to adjacent sidewalks panels. o No type of "fill" material that deteriorates or breaks apart over time will be used for mitigation of trip hazards (i.e. asphalt, concrete, polymers, etc.). Slab replacement, slab jacking and grinding shall not be acceptable alternates. o No heavy equipment such as tractors, ski steer loaders, backhoes, etc. shall be used. Water-cooling is not allowed as it creates slurry contaminants that reach catch basins. o No damage will be caused to landscaping, retaining walls, curbs, sprinkler heads, utility covers, or other objects adjacent to sidewalks. If damage is caused to the above, the Contractor will notify the Town immediately and the Contractor will repair the damages at the Contractor's expense within 48 hours of the time the damage occurred. o A dust containment system that minimizes dust and prevents debris runoff into storm drains will be employed per OSHA guidelines. o All debris will be immediately and completely cleaned up after each hazard is repaired. o Hazard repairs will be free of ridges or grooves that could hold water and prevent drainage of rain or irrigation. o The slope of all repairs will be at an ADA compliant slope of 1:12, or precisely as specified by the Town. o Repaired surfaces will have a coefficient of friction that exceeds OSHA slip resistance standards subject to verification by Town engineer/inspector. Refer to OSHA handbook for standards. Submit daily, weekly, or periodic summary of itemized hazards evaluated and repaired via email to the Project Coordinator. The summary shall be reported in inch feet; an inch foot is equal to the average height of a hazard, multiplied by the width of the hazard. o Example: If a raised sidewalk panel has a height differential on one side of 1" and tapered to 0" on the other side of a full 4-foot width sidewalk, it would be calculated as follows: ((1" + 0) / 2) x 4' = 2-inch feet 2-inch feet x Price per Inch Foot = Price per repair. o The submitted summary will include, but is not limited to: Physical location (address) of each repair [latitude /longitude reading if possible], Before and after pictures of each repair for inspection and audit purposes, After picture will include slope verification, Itemized cost for each repaired hazard, the specific hazard height --both the high side and the low side measurement in 8ths of an inch, Total width of the actual repair in feet or inches, The "inch foot" calculation for the repaired surface area, Square feet repaired. o From Contractor data and invoicing, the Town should be able to compile the following data for internal use: the cumulative linear feet, square feet, and height of completed repairs, the total cost per each repair, the average cost per repair, the slope of each repair, the average cost per square foot, project budget status, and daily totals from each day of trip hazard removal operations. Questions related to this RFP should be sent to mkowalski@townofmorrisville.org November 15, 2023 at 12:00 PM EDT. The Town of Morrisville reserves the right to reject any responses to this RFP that do not meet the selection criteria, to waive minor irregularities, and to conduct discussions with any or all respondents. The Town accepts no financial responsibility for any costs or expenses incurred by any entity in responding to this RFP. All submissions may be kept by the Town and may be disclosed to third parties at the Town's discretion. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Morrisville, NC
Bid Date: Oct 01 2024
Morrisville, NC
--
Morrisville, NC
Bid Date: Oct 02 2024
Morrisville, NC
Bid Date: Oct 22 2024
Morrisville, NC
Bid Date: Aug 26 2024
Morrisville, NC
Bid Date: Sep 27 2024
Morrisville, NC
Bid Date: Nov 08 2023
Morrisville, NC
Bid Date: Nov 21 2023
Morrisville, NC
Bid Date: Nov 01 2023
Morrisville, NC
--
Morrisville, NC
Bid Date: Oct 27 2023
Morrisville, NC
--
Morrisville, NC
Bid Date: Feb 10 2023
Morrisville, NC
Bid Date: Oct 27 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
