Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

December 14, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

$480,000.00

Public - County

img_map_placeholder

Multiple Locations, Houston, TX

Our team is requesting plans for this project.

Subscribe to View Full Documents

The work in this contract is for the Sanitary Sewer Phase 7 for Malcomson Road Utility District located in Canterbury Forest, Lakeview Village, Lakeview Place and Louetta. The purpose of this project is to improve the conditions of sanitary sewer lines and manholes in the aforementioned locations, improve sanitary sewer flow and reduce sanitary sewer overflows in the area. In general, this work consists of: Pipe bursting of sanitary sewer lines including service reconnections in kind, drop stack reconnections, and cleanout replacements. Cleaning and preparation of sanitary sewer manholes prior to rehabilitation, including removing existing liners, debris, existing utility cables etc. Repair of sanitary sewer manholes including cementitious lining, removing and replacing frame and cover, raising sanitary sewer manholes, repair of bench and invert, grouting exterior of manhole frames, and removing and relocating pipe and/or cable through sanitary sewer manholes. Contractor shall initiate coordination with pipe and/or cable owner within 30 days of notice to proceed and provide proof of ongoing communication throughout the project at a frequency of at least once every 30 days until completed. Coordinating with District Operations Staff and Engineer to reduce and maintain flow from lift stations into the sanitary sewer system in order for rehabilitation work to be performed. Site restoration including removing and replacing concrete sidewalks and pavement including driveways, roadways, curb, gutter, damaged turf, plants, shrubs, fences, and trees, as required. Implementation and maintenance of traffic control when necessary or required. Contractor to note that these plans may not include all necessary Traffic Control Plans. Contractor to ensure traffic control is executed as necessary to facilitate work. Performing trench safety as required per Section 01561.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.