Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 15, 2023

January 15, 2024

September 2, 2024

200 Catherine St

Renovation

No Information to Display

$4,500,000.00

Public - City

img_map_placeholder

200 Catherine St, Gardner, MA

Subscribe to View Full Documents

Gardner High School - HVAC and Electrical Upgrade. Acoustical Tile, Electrical, HVAC, Painting, Roofing and Flashing. The Work includes the following major items: a. Demolition and removal of existing main electrical switchboard and select panelboards. b. Installation of owner furnished main electrical switchboard and select panelboards. c. Demolition and removal of existing ceiling and lighting in the Auditorium lobby, corridor, and workshop area as shown. d. Furnish and install new ceiling and lighting in lobby, corridor and workshop area as shown. e. Furnish and install new lighting in Auditorium. f. Furnish and install a rooftop air handling unit on the Auditorium roof. g. Added structural steel support for AHU and acoustical reflector panel. h. Paint Auditorium ceiling. i. Install power to panelboards, HVAC equipment and lights as specified The scope of work consists of upgrading select HVAC systems and electrical gear; replacing, or removing and reinstalling, existing ceilings and lighting systems as required to facilitate the HVAC, Electrical, and Structural work per the construction documents. Select existing steel will be reinforced to support proposed HVAC equipment. Roof patch work and flashing will be required for HVAC rooftop units. Concrete pads will be required for HVAC units on grade. Select electrical switchgear and panel boards will be furnished by owner, installed by the Electrical subcontractor. All questions and requests for clarification or interpretation of the Bid Documents shall be in writing and addressed to the Purchasing Agent, Question Deadline 11/08/2023

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.