Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 7, 2024

No Information to Display

FL-91

Paving, Site Work

No Information to Display

$15,260,000.00

Public - State/Provincial

img_map_placeholder

FL-91, Stuart, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Project Threshold : Project is Less than $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 08 Selection Method : Letter of Response and Oral Presentation Project Description : TPK Mainline Interchange Improvements at SR 714 MP 134.5 Plain Language Description : 446165-1 Turnpike Mainline Interchange Improvements at SR 714 (MP 134.5) 446333-1 & 446334-1 Widen TPK (SR91), SW Martin Hwy to St. Lucie County Line (MP 134.5-138.08) - 4 to 8 lanes & Widen TPK (SR91) from Martin County Line to Becker Rd (MP 138.08-138.5) 4 to 8 lanes 446335-1 Widen TPK Mainline, SW Becker Rd to Crosstown Parkway (MP 138.5-144.58) - 4 to 8 lanes 452120-1 Widen Western Beltway (SR429), North of US 192 to North of Western Way (MP 6-8) 452121-1 Widen Western Beltway (SR429), North of Western Way to Seidel Road (MP 8-11) 436194-3 Widen TPK (SR91) from US 192 to Partin Settlement RD (MP 242-243.5) 4 to 8 lanes Number of contracts that may be awarded from this advertisement : 6 Advertisement Date 10/24/2023 Response Deadline Date/Time 11/07/2023 03:30 am Longlist Date/Time 11/29/2023 07:30 pm Shortlist Selection Date/Time 12/05/2023 07:30 pm Oral Presentation Date/Time 1/17/2024 Final Selection Date/Time 2/06/2024 07:30 pm Negotiations Period Begin Date 2/09/2024 Negotiations Period Ending Date 4/19/2024 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - TPK Mainline Interchange Improvements at SR 714 MP

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects