Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 17, 2023

December 18, 2023

March 18, 2024

401 Venice Blvd

Paving, Site Work

No Information to Display

$500,000.00

Public - State/Provincial

img_map_placeholder

401 Venice Blvd, Half Moon Bay, CA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Half Moon Bay State Beach - Venice Beach Parking Lot and Restroom Rehabilitation. Engineer's Estimate: $300,000 to $500,000. Questions and Answers: Any discrepancies, omissions, ambiguities, or conflicts in or among the contract documents or doubts as to meaning shall be brought to the State's attention by emailing your questions to Merrilee.Byrnes@parks.ca.gov NO LATER THAN 2 p.m., seven (7) calendar days prior to bid opening date. Answers will be provided by Addendum on this website, and it is the responsibility of the bidders to download any addendum as needed. The Department of Parks and Recreation reserves the right to waive any irregularity in a bid or to reject any or all bids. Bond requirements for contracts exceeding $5,000 are stated in the General Conditions, DPR 483, Section 000700. Liquidated Damages. Failure of Contractor to complete the Work within the Contract Time will result in damages being sustained by State. It is and will be extremely difficult and impracticable to determine the actual damage which State will sustain by reason of such delay. Therefore, Contractor shall pay to State, as liquidated damages, the sum of One Thousand Dollars ($1,000.00) for each and every Calendar Day's delay in finishing the Work under this Contract beyond the stipulated number of days, or any adjustments thereof. Participation in Disabled Veteran Business Enterprise Program (DVBE): The minimum DVBE participation percentage goal is 6%. Failure to fulfill the DVBE requirement will render your bid non-responsive. Small Business Preference and Small Business Subcontractor Participation: A five percent (5%) Small Business Preference will be granted to properly certified small businesses (a completed STD 811 Form must be submitted with the bid proposal). Contract Term: Fifteen (15) Months from Notice to Proceed License required: A and/or B *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.