Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 29, 2023

December 29, 2023

June 3, 2024

To Be Determined

Renovation, Site Work

No Information to Display

$355,400.00

Public - City

img_map_placeholder

To Be Determined, Dixon, WY

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Town of Dixon Wastewater Lagoon Improvements Est. Completion Date: June 7, 2024 The installation of two new surface-based aerators, mooring lines, mooring posts, power connections and paneling. Additionally, the project will include the procurement and finishing of a new chemical dosing building and associated appurtenances. This will include foundation preparation, chemical dosing line installation, and discharge point installation at the points of injection.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects