Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 28, 2023

January 29, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$3,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Dunn, NC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Collection System Improvements This project consists of the rehabilitation of approximately 2,161 LF of 6-inch existing gravity sewer line, 18,137 LF of 8-inch existing gravity sewer line, 374 LF of 10-inch gravity sewer line, 892 LF of 12-inch gravity sewer line, 699 LF of 15-inch gravity sewer line and rehabilitation/replacement of approximately 113 manholes. The rehabilitation will include the replacement and reconnection of approximately 419 sewer connections and 14,770 LF of 4-inch sewer laterals.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.