Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

December 14, 2023

No Information to Display

1 Tranquility Base

Renovation

No Information to Display

$200,000.00

Public - State/Provincial

img_map_placeholder

1 Tranquility Base, Huntsville, AL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Reference Number 0000333568 The Alabama Space Science Exhibit Commission DBA U.S. Space & Rocket Center seeks sealed bids for the removal and replacement of the existing flooring in the Space Camp Habitat No. 2 Building. The Public Bid for the flooring replacement as listed below: Total square footage is approximately 18,000. Work encompasses the installation of Luxury Vinyl Tile in (6) sleeping quarters, (15) Resident Assistant rooms, (2) rest rooms, (1) auditorium, (2) infirmaries, (2) Office areas, (2) Storage areas, (1) classroom, (1) 1st floor janitor closet, (1) Break Room, (1) Other Closet. The contractor shall furnish complete flooring services for these described areas for the U.S. Space & Rocket Center, including all reasonable and necessary , supervision, equipment, materials, and supplies in order to complete the project. Installation must be phased sequentially per floor so as to not disrupt USSRC Space Camp schedules. Flooring - the color and type of flooring shall be consistent or complimentary with the currently installed Luxury Vinyl Tile. The flooring colors shall be: Teal Oxide for Sick Bay 1 Deep Cobalt for Sick Bay 2 Rouge for Sick Bay Office Deep Cobalt for Photography Office Rouge for boarder of Challenger Auditorium Deep Cobalt for majority of Challenger Auditorium Medium Gray for all others Three boxes of medium gray LVT shall be included in the bid as stock. 4" Black cove base will be needed in most areas. FIRST FLOOR. Leo Bay 960 SqFt Leo RA 96 SqFt Phoenix Bay 1,717 SqFt Phoenix RA 96 SqFt Aquarius Bay 1,375 SqFt Aquarius RA.1 100 SqFt Aquarius RA.2 100 SqFt Orion Bay 1,525 SqFt Orion RA 136 SqFt Janitor Break Room 425 SqFt Janitor Closet 45 SqFt Closet Other 37 SqFt Sick Bay 1 1,230 SqFt Sick Bay 2 879 SqFt Delivery Point One Tranquility Base Huntsville, Alabama United States 35805 General Requirements - Bid Deposit Required - Contractors License Required - Employee Background Checks Required - Installation Required - Insurance Required - Safety Standards Plan Bonding Requirements - Bid Bond 5 %

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.