Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 25, 2024

March 25, 2024

February 1, 2025

2455 Rentzel St

Outdoor Lighting, Paving, Renovation, Site Work

No Information to Display

$11,948,834.00

Public - City

img_map_placeholder

2455 Rentzel St, Dallas, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Org 971 - North Dallas Service Center - Renovation Office Area: 1. Expanded RR at Break Room Building (Included in new pre-manufactured building) 2. Replace Wood Deck and Ramps/Steps 3. Fire Alarm 4. Add GFCI in the Kitchenette Area of the main building Shop Area: 1. Restripe Parking Lot 2. Replace (3) 42" fans in shop 3. Shop LED 4. New Ceilings and Lighting in shop office 5. Replace 4 gas heaters in shop 6. Taller Shelving and new lighting in parts room office 7. Add 12' x 80' canopy with gutters on north side of building at bay 8. Replace Rusted Framing in Bus Wash 9. Replace Bus Wash 10. Add Key Box Site: 1. Replace Site Lighting With LED 2. Repair Concrete Paving - Various Question Deadline 01/10/2024 Technical questions and all other questions related to this solicitation are to be referred to: Attention: Dallas ISD Procurement Services Email: ProcurementCS@dallasisd.org Completed CSP Package Part 1-A, 1-B and 1-C are due on Thursday, 1/25/2024 at 2:00 PM (local time). Completed CSP Package Part 2 is due on Friday, 1/26/2024 at 3:00 PM (local time). Any materials received after the respective closing dates / times will not be considered. The District will open and read the names of the proposers and prices submitted in responsive CSPs beginning at 3:00 P.M. local time upon submittal of Part 2 of the Package, via Zoom. Join Zoom Meeting https://us05web.zoom.us/j/85426648386pwd=ZM5FbbB47Dc3zcaGBBansWeZEP5iL7.1 Meeting ID: 854 2664 8386 Passcode: Ki1rRU A Proposal bond on Dallas ISD Proposal Guarantee Bond Form, from a Surety authorized to transact business in the State of Texas, in the amount of not less than ten percent (10%) of the greatest total amount of the proposed contract amount (Base Price plus all Allowances), payable without recourse to the order of the Dallas ISD Board of Trustees, must accompany the Proposal as a guarantee that, if awarded the Contract, the proposer will promptly enter into and execute the Contract and Performance and Payment Bonds on the forms provided. A separate contract will be issued by Dallas ISD for each school. The Contractor will be required to provide Payment and Performance Bonds for each contract. Contractor shall be responsible for all permit costs including plan review fees. The Dallas Independent School District's Construction Services projects have a 30% Minority and Women-Owned Business Enterprise (M/WBE) construction goal. The right is reserved to reject any or all bids, proposals, CSPs or statements of qualification and to waive technicalities.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.