Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 16, 2023

October 1, 2024

July 1, 2025

3 Discovery Dr

Renovation

No Information to Display

$360,000.00

Public - State/Provincial

img_map_placeholder

3 Discovery Dr, Storrs Mansfield, CT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The purpose of this Request for Qualifications ("RFQ") is Construction Managers at Risk for pre-construction, planning, and construction services for the renovation of IPB for the relocation of C2E2 project. The Owner intends to utilize a Construction Manager (CM) at Risk contract format with a Guaranteed Maximum Price, (GMP), with a separate negotiated preconstruction services contract. The goal of this project is to renovate existing shell spaces within the Innovation Partnership Building into a wet lab on the 1st floor and dry lab on the 3rd floor. The group that is relocating to this space is the Center for Clean Energy (C2E2). C2E2 is a multi-disciplinary research center focusing on education, research, and innovation in sustainable energy systems. By catalyzing the transformation of science-tosystems for a global "Sustainable Energy Economy," our faculty and students work together in partnership with federal, state, and industrial leaders to develop and accelerate cost-effective solutions to tackle global energy and environmental concerns. Their Mission is to become a leader in transforming science to systems; bridging the gap from fossil fuels to 100% renewable energy and enabling the development of economical solutions for critical technical issues; and providing guidance and leadership in solving global societal issues ranging from sustainable energy to the environment. The renovation project will comprise a total of 8,107 SF. The spaces have a variety of valved and capped services for future use. This project will bring the building to 100% occupancy. This project will include lab equipment relocation and heavy MEP customization. Coordination with equipment vendors and specialty materials will be present during the project. RFI Deadline Date 11/03/2023 2:00 PM

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects