Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
January 11, 2024
No Information to Display
US-78
Paving, Site Work
No Information to Display
$450,000.00
Public - Federal
US-78, N Charleston, SC
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The proposed project consists of establishing a freshwater stream and wetland umbrella mitigation bank in the Edisto River (HUC 03050206) and Four Hole Swamp (HUC 03050205) Subbasins within the Middle Atlantic Coastal Plain Level III Ecoregion. The BFUMB is entirely contained within Brosnan Forest and is proposed to be comprised of five individual mitigation bank sites, each associated with and situated within one of five unrestored watersheds on Brosnan Forest as follows: Indian Field I, Indian Field II, Tom & Kate Branch, Turkey Creek South, and Walnut Branch. With the exception of a small portion of the Walnut Branch watershed, the BFUMB is proposing to extend from the headwaters of each of these unrestored watersheds to the points where each of these watersheds exit Brosnan Forest. The five watersheds evaluated for the proposed BFUMB span approximately 8,629 acres of Brosnan Forest's 14,405 acres. BFUMB is proposed to complement the currently established adjoining Brosnan Forest Mitigation Bank (BFMB) and Brosnan Forest Coldwater Branch Mitigation Bank (BFCBMB). Preliminary evaluations conducted to approximate the potential stream and wetland mitigation opportunities within each of the five sites initially proposed within the BFUMB resulted in the estimated opportunity for approximately 121,000 linear feet of stream mitigation (an estimated 60,539 FF) and approximately 2,200 acres of potential wetland mitigation within the BFUMB. The plan for the BFUMB involves the restoration, enhancement, and/or preservation of the streams, riparian wetlands, non-riparian wetlands, and associated forested buffers and uplands within each of the five mitigation sites. Primary restoration activities for the bank sites would include: 1) removing loblolly pine plantations, 2) removing dams, roads, and other earthwork to the extent practicable, 3) filling/plugging ditches to restore hydrology, 4) planting native trees and shrubs to restore wetland plant communities, 5) restoring stream channels and associated wetlands in historic valleys, and 6) suppressing nuisance and invasive species vegetation. The Sponsor is proposing to add the Indian Field II (IFII) Mitigation Site (33.1513, Longitude: -80.4308) as the first site under the BFUMB. Preliminary evaluations conducted to approximate the potential stream and wetland mitigation opportunities for the IFII Mitigation Site resulted in the estimated opportunity for approximately 18,000 linear feet of stream mitigation, representing more than 9,500 functional feet, and approximately 200 acres of potential wetland mitigation.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
N Charleston, SC
Bid Date: Aug 14 2023
Lexington, SC
Bid Date: Nov 16 2023
Indian Land, SC
Bid Date: Oct 25 2023
Orangeburg, SC
Bid Date: Oct 25 2023
Columbia, SC
Bid Date: Oct 25 2023
Sumter, SC
Bid Date: Nov 21 2023
Mount Pleasant, SC
Bid Date: Nov 10 2023
Galivants Ferry, SC
--
Charleston, SC
Bid Date: Sep 26 2023
Greenville, SC
Bid Date: Oct 25 2023
Fountain Inn, SC
--
Pickens, SC
Bid Date: Oct 04 2023
Holly Hill, SC
Bid Date: Oct 25 2023
Greenville, SC
Bid Date: Oct 25 2023
Charleston, SC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
