Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

January 8, 2024

May 15, 2024

Multiple Locations

Renovation, Site Work

No Information to Display

$1,800,000.00

Public - City

img_map_placeholder

Multiple Locations, Chester, MT

Subscribe to View Full Documents

Chester Wastewater Improvements - 2023 The proposed work includes two schedules. Schedule I includes improvements to the Chester wastewater collection and treatment system, with improvements at the existing lagoons site and installation of several new manholes in various locations around town. Collection system improvement include replacing approximately 390-feet of gravity sewer in the alley south of Casey St between 1st Street E and 2nd Street E., and installation of seven (7) new manholes on stub ends of existing sewer mains. Treatment system improvements include sludge removal from Cell 1 of the existing wastewater lagoon cells, removal of existing and installation of a new flow structure and influent flow splitter structure, removal of the Cell 1 outlet, Cell 1 alternate outlet, Cell 2 outlet, and Cell 3 inlet, and replacing existing 10" gate valves with 5 new 10" plug valves and fittings. At the existing lagoon site lift station, installation of new lift station flowmeter, removal and replacement of existing rock basket, and lining of the existing wet well. The multi-level outlet structure at the effluent of Cell 3 is to be lined and the existing depth gauge in the outfall flume is to be removed and replaced. Schedule II includes a Base Bid of CIPP lining of an approximate 1,750 LF of 10" diameter clay pipe as well as three additive alternates. Additive Alternate #1 includes CIPP lining of approximately 1,540 LF of 8" diameter pipe including 910 LF of concrete pipe and 630 LF of clay pipe. Additive Alternate #2 includes CIPP lining of approximately 480 LF 8" diameter clay pipe, and Additive Alternate #3 includes CIPP lining of approximately 860 LF of 8" diameter clay pipe.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.