Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
November 24, 2023
February 29, 2024
74 Sawmill Rd
Paving, Site Work
No Information to Display
$350,000.00
Public - City
74 Sawmill Rd, Sherman, CT
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The intent of this Request for Proposals (RFP) is to obtain the services of licensed qualified professionals for the design of the replacement of the existing Town docks, sea wall, the design of the expansion of the dock area, and finally the design of shoreline stabilization measures and Vegetated Riparian Buffer Zones The Town seeks a fixed fee for all professional services including but not limited to Civil Engineering, Landscape Architect, Structural Engineering and other related disciplines. The proposed project consists of removal of the existing failing wooden retaining wall (seawall) in the boat dock area that the boat docks are connected to, and install new boat dock and boat dock anchorage system. The plan is also to increase the existing 57 boat dock footprint to approximately 70 dock spaces that are connected to the shore via singular bulkheads. The removal of the sea wall will allow the Town to use a softer shore line stabilization system consisting of a stone armored shoreline system for protection and stabilization of that area plus interconnect these improvements with Vegetated Riparian Buffer Zones. In addition, it is anticipated that a walkway consisting of a hard surface will be also constructed to provide access to the dock bulkheads from the access points in the parking lots to the docks. In order to design the extent of the build out for the expansion of the boat dock project for the Town, the east side of the lake has to be surveyed to determine the existing boat docks that are present in order to determine the available area for the build out and also comply with FirstLight Regulations of not exceeding the use of one third the available width from these private docks and the Town's shoreline. Electronic transmittal of responses either through fax or email will not be accepted. All questions regarding this RFP shall be directed to the First Selectman Office, Mallory Town Hall, Town of Sherman, Care of Ruth Byrnes, Administrative Assistant, Town of Sherman Town Hall, 9 RT 39 North, Sherman, CT. 06784, rbyrnes@townofshermanct.org, 860-355-1139 and must be submitted prior to October 23, 2023 by 10 am via email. Any addendum issued will be posted on the Town's electronically and it's the responsibility of the proposer to look for the addendums and also provide an acknowledgement in their proposal that they have read the addendum and responded appropriately. November 24, 2023: Notice to Proceed February 15, 2024: Submit 90 percent design drawings to FirstLight for endorsement to submit to FERC for approvals February 29, 2024: Completion of design for submittal to Town's regulatory commissions, FirstLight and FERC. The Town's Wetlands Commission would prefer that an application be submitted to them and have them provide approval with conditions before sending the plans to FirstLight for approval. The Town will require strict adherence to the schedule to meet critical milestones. This project can only be constructed in the off season so completing the design documents and securing approvals is critical. The Proposer shall provide the required deliverables based on the schedule listed above.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Sherman, CT
--
Sherman, CT
Bid Date: Jun 13 2019
Sherman, CT
Bid Date: Apr 25 2019
Sherman, CT
Bid Date: Jun 13 2019
Canaan, CT
Bid Date: Nov 07 2023
Naugatuck, CT
Bid Date: Nov 03 2023
Ansonia, CT
Bid Date: Oct 30 2023
Fairfield, CT
Bid Date: Nov 02 2023
Greenwich, CT
Bid Date: Oct 12 2023
Glastonbury, CT
Bid Date: Nov 07 2023
New Milford, CT
Bid Date: Nov 02 2023
Darien, CT
Bid Date: Nov 16 2023
Terryville, CT
Bid Date: Apr 18 2019
Prospect, CT
--
Prospect, CT
Bid Date: Jan 21 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
