Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

January 8, 2024

June 24, 2024

3830 Pilot Knob Rd

Renovation

No Information to Display

$1,300,000.00

Public - City

img_map_placeholder

3830 Pilot Knob Rd, Eagan, MN

Subscribe to View Full Documents

Project Category Code: Demolition/Building Removal/Hauling/Salvage, Erosion Control/Slope, Bank Stabilization, Traffic Control Devices (Signals, Signing, etc.), Electrical Equipment & Supplies, Directional Drilling, Lift Stations/Lift Station Equipment, Instrumentation & Control, Pumps or Pump stations, Fittings and Valves, Fittings and Valves, Sewer Inspection/Rehabilitation, Meter Vault Improvements, Erosion Control/Slope, Bank Stabilization, Piping, Well Drilling, Water Resources Infrastructure, Erosion Control - Temporary, Liquid Dust Control, Precast, Removal and Replacement of pipe Description: Work includes removal of the existing lift station controls, precast wet well lid, pump, piping, fittings, and all related appurtenances inside the wet well, removal of the existing lift station controls, precast wet well lid, pump, piping, fittings, and all related appurtenances inside the wet well, reuse the existing wet well and furnish new valve vault structure. Install new pump, piping, fittings, valves, and all appurtenances for the new station, furnish and install new controls and SCADA infrastructure. PROJECT LOCATION The project is located in the City of Eagan, MN, which is located in Dakota County. The project location is shown on the vicinity map in the design drawing set. PROJECT DESCRIPTION A. The work hereafter referred to requires the complete construction and start-up necessary for the facility with all required necessary equipment, generally described, but not limited to, in the following paragraphs: 1. Removal of existing lift station equipment and piping at the Lexington Storm Lift Station. The project includes the removal of the existing lift station controls, precast wet well lid, pump, piping, fittings, and all related appurtenances inside the wet well. 2. Reuse the existing wet well and furnish new valve vault structure. Install new pump, piping, fittings, valves, and all appurtenances for the new station. 3. Furnish and install new controls and SCADA infrastructure for the Lexington Storm Lift Station, as noted in the Contract Documents. 4. Perform various other miscellaneous and site improvements as detailed in the Contract Documents.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.