Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 7, 2023

February 5, 2024

February 4, 2025

Multiple Locations

Site Work

No Information to Display

$1,790,000.00

Public - City

img_map_placeholder

Multiple Locations, Red Hook, NY

Subscribe to View Full Documents

Work shall include but is not limited to: Contract #2G: This work consists of the replacement of the existing water mains and valves on Cherry and Graves St in the village of Red Hook. Upgrades also include pavement restoration, a roadway underdrain, curb, milling, and paving as well as the complete replacement of all existing water services, shut-off valves, and hydrants as well as additional new hydrants and valves. A Pre-Bid conference will not be held for this project. Contract Documents may be examined at no expense online at the website or at the office of Delaware Engineering, D.P.C., 28 Madison Ave Extension Albany NY, 12203. Any Bidder who submitted completed Bid Forms to the Village of Red Hook, upon returning such set in good condition within thirty days following the award of the contract or rejection of the bids, will be refunded his full payment. Deposits will not be refunded to any non-bidder (including material suppliers, subcontractors, or those that provide quotes to Bidders). Questions should be sent to Robert Flores, PE via email at rflores@delawareengineering.com or Fax at (518) 452-1335. Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Information for Bidders. No Bidder may withdraw his bid within forty-five (45) days after the actual date of opening thereof. The project is funded with a state grant and 20% MWBE utilization is required. The right is reserved to waive any informalities in the Bid and to reject any or all Bids. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Question Deadline 11/30/2023

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.