Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 16, 2023

December 18, 2023

September 18, 2024

5072 Benson Rd

Site Work

No Information to Display

$842,940.00

Public - City

img_map_placeholder

5072 Benson Rd, Union City, CA

Subscribe to View Full Documents

Reference Number 0000332978 The project consists of renewal and rehabilitation work at the Alvarado Influent Valve Box (AIVB) and its related components, all located at the Alvarado Wastewater Treatment Plant (WWTP). The rehabilitation work includes the following: Rehabilitate the AIVB as follows: Replace two 42-inch knife gate valves and flanged coupling adapter on the existing twin force main pipes, including valve support, extension stem and yoke and one electric motor actuator. One existing electric motor actuator shall be removed and reinstalled as shown on the drawings. The knife gate valves and one new electric motor actuator will be furnished by the District. Replace the teflon packing for each knife gate valve located between the stem and the valve body. Remove the existing pipe wall spools between two knife gate valves and the north wall of the AIVB. Furnish and install new 42-inch pipe spools. Perform interior lining repairs to the existing force main piping, including removing existing failing lining material, surface preparation, and installation of lining repair material. Perform exterior coating repairs to the existing force main piping, including removing existing failing coating system, surface preparation, installation of steel plate repair patches and installation of epoxy coating to the exterior of the existing piping. Removal and replacement of two existing peroxide injection ports on the two force main pipes, including cutting out existing outlets, removal of existing plug valves and blind flanges, preparing existing force main pipe wall, installation of new steel plate with 4" flanged outlet, installation of District-furnished 4" plug valve and blind flange with peroxide piping "stinger" and repairing damage to existing force main pipe caused by the work. Repair the existing concrete platform and railing connection. Job Location Union Sanitary District Questions are submitted online No Questions concerning this project should be directed to: Sanitary District Attn: Kevin Chun, Project Manager 5072 Benson Road City, CA 94587 Phone: 510-477-7608. The successful bidder will have two hundred seventy-five (275) calendar days to complete the Project from the Notice to Proceed, regardless of whether any or all bid alternates are selected by the District. The Engineer's Estimate for this Project is $842,940. Each bid shall be presented under sealed cover and shall be accompanied by a certified check or bidder's bond, made payable to the District, in an amount not less than ten percent (10%) of the bid. *The District reserves the sole right to reject any and all bids and to waive any informality in a bid.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects